Dam/Levee Break ^ Flooding ^ Severe Storm - Douglasville, Ga. , October 21, 2009 -- FEMA Public Assistance Technical Assistance Contractor Frank Lockridge(L), County Water and Sewer Authority Project Engineer Kathy Macias, and FEMA Public Assistance Coordinator Pressly Beaver are inspecting a breach area of the Dog River Reservoir Dam which failed during recent severe storms and flooding. Repairs are underway with 44 truckloads of gravel used to fill this site and FEMA Public Assistance funds have been requested to help with repair cost. George Armstrong/FEMA
Summary
The original database describes this as:
Title: FEMA Public Assistance Officers with County Official
Production Date: 10/21/2009
Caption: Douglasville, Ga. , October 21, 2009 -- FEMA Public Assistance Technical Assistance Contractor Frank Lockridge(L), County Water and Sewer Authority Project Engineer Kathy Macias, and FEMA Public Assistance Coordinator Pressly Beaver are inspecting a breach area of the Dog River Reservoir Dam which failed during recent severe storms and flooding. Repairs are underway with 44 truckloads of gravel used to fill this site and FEMA Public Assistance funds have been requested to help with repair cost. George Armstrong/FEMA
Photographer Name: George Armstrong
City/State: Douglasville, GA
Disasters: Georgia Severe Storms and Flooding (DR-1858)
Disaster Types: Dam/Levee Break ^ Flooding ^ Severe Storm
Categories: Public Assistance ^ Recovery ^ State/Local Officials
Photographs Relating to Disasters and Emergency Management Programs, Activities, and Officials
Tags
Date
Source
Copyright info