
Similar
Right side front view medium shot as STAFF Sergeant Fereige Sass, of the Hungarian Engineering Contingent, guides a stack of decking sections onto the Mabey and Johnson bridge. The sections will be bolted on the bridges skeleton that will enable travel across the Bosnia river. Main supply routes for Stabilization Force (SFOR), Personnel have to be in good condition to allow freedom of movement in Bosnia-Herzegovina Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since ...
Summary
The original finding aid described this photograph as:
[Complete] Scene Caption: Right side front view medium shot as Staff Sergeant Fereige Sass, of the Hungarian Engineering Contingent, guides a stack of decking sections onto the Mabey and Johnson bridge. The sections will be bolted on the bridges skeleton that will enable travel across the Bosnia river. Main supply routes for Stabilization Force (SFOR), Personnel have to be in good condition to allow freedom of movement in Bosnia-Herzegovina Many bridges are downgraded by Stabilization Force (SFOR), Engineers due to various safety reasons. A bridge in Doboj (Not shown), failed an inspection due to heavy traffic flow. The solution to the problem is the Mabey and Johnson Bridge. The project has been on going since September and is expected to be completed November 21, 1998.
Subject Operation/Series: JOINT FORGE
Base: Sarajevo
Country: Bosnia And/I Herzegovina (BIH)
Scene Camera Operator: SRA Omolara Akinretoye, USAF
Release Status: Released to Public
Combined Military Service Digital Photographic Files
Tags
Date
Source
Copyright info