STS053-246-004 - STS-053 - Engineering view of the plumbing in the WCS for the FARE experiment.
Summary
The original finding aid described this as:
Description: Engineering view of the plumbing for waste or overflow drain lines connected to the middeck Fluid Acquisition and Resupply Equipment (FARE) experiment consisting of plastic tubing and fittings routed around the side hatch and connected to the waste collection system (WCS). FARE is an experiment to learn more about the dynamics of liquids (fuel, etc.) transfer in micro gravity.
Subject Terms: STS-53, DISCOVERY (ORBITER), FLUIDS, MIDDECK, WASTE DISPOSAL, PHYSICS ONBOARD ACTIVITIES
Categories: Experiment (Non-medical)
Interior_Exterior: Interior
Ground_Orbit: On-orbit
Element: Shuttle Middeck
Original: Film - 35MM CN
Preservation File Format: TIFF
STS-53
Tags
Date
1981 - 1989
Source
The U.S. National Archives
Copyright info
No known copyright restrictions