Not developed or endorsed by NARA or DVIDS. Part of the World's largest public domain source PICRYL.com.

construction, fort mccoy wisconsin

public
4,989 media by topicpage 2 of 50
Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Nov. 28, 2017, at Fort McCoy, Wis. A $9.9 million contract for the new construc... More

Workers with Nuvo Construction Inc. of Milwaukee work

Workers with Nuvo Construction Inc. of Milwaukee work

Workers with Nuvo Construction Inc. of Milwaukee work on constructing a new storage building Jan. 5, 2018, at Constitution Park at Fort McCoy, Wis. The $724,000 storage facility will be used by the Directorate ... More

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings on the cantonment area July 24, 2019, to make room for the construction of a new $24 million 400-bed, four-story barracks at Fort McCoy, Wis. The demolition... More

Work by contractors with Relyant Global LLC work on

Work by contractors with Relyant Global LLC work on

Work by contractors with Relyant Global LLC work on a new $7.03 million shipping and receiving facility is shown Dec. 12, 2019, near the new Gate 20 on North Post at Fort McCoy, Wis. The contract calls for the ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown April 3, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build a new tower Nov. 13, 2017, on Range 29 on North Post at Fort McCoy, Wis. Range 29 is one of 31 live-fire ranges at the installation. The new tower will be f... More

Contractor Terra Engineering of Madison, Wis., is shown

Contractor Terra Engineering of Madison, Wis., is shown

Contractor Terra Engineering of Madison, Wis., is shown completing construction for a new spillway and slope repair for Stillwell Lake on South Post on Aug. 8, 2018, at Fort McCoy, Wis. Stillwell is one of two ... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Dec. 3, 2018, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being con... More

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings on the cantonment area Aug. 6, 2019, to make room for the construction of a new $24 million 400-bed, four-story barracks at Fort McCoy, Wis. The demolition ... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build a new tower Nov. 13, 2017, on Range 29 on North Post at Fort McCoy, Wis. Range 29 is one of 31 live-fire ranges at the installation. The new tower will be f... More

Contractors work on a water main infrastructure project

Contractors work on a water main infrastructure project

Contractors work on a water main infrastructure project July 11, 2019, on the cantonment area at Fort McCoy, Wis. During spring, summer, and fall every year, construction projects like this one take place at Fo... More

Crew workers from the McAlester Army Ammunition Plant

Crew workers from the McAlester Army Ammunition Plant

Crew workers from the McAlester Army Ammunition Plant (MCAAP) of McAlester, Okla., work on a section of rail on the cantonment area July 23, 2019, at Fort McCoy, Wis. The work is part of a two-year project to i... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Sept. 26, 2018, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being c... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown April 3, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Contractors work on paving a road in the cantonment

Contractors work on paving a road in the cantonment

Contractors work on paving a road in the cantonment area May 7, 2020, at Fort McCoy, Wis. The road paving was part of work being done on several roadways over the three-week period at the installation in April ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Dec. 3, 2020, at sunset as a new multi-million dollar transient troop training barracks is being built at Fort McCoy, Wis. Contracto... More

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is headquartered in Maryville, Tenn., work on constructing a new building for the installation's Child and Youth Services administration and storage Oct. 26, 2017... More

Army reserve soldiers with the 284th EngineerCompany

Army reserve soldiers with the 284th EngineerCompany

Army reserve soldiers with the 284th EngineerCompany working on a new cold storage building at part of troop projects at Fort McCoy Wi.

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Nov. 1, 2018, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being con... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the former community activity center, building 2000, on Dec. 12, 2018, as part of a $5.1 million renovation of the building. Construction completion i... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the construction of a salt/sand storage facility Jan. 9, 2019, at Fort McCoy, Wis. Platt Construction received a $555,000 contract to build the facili... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the former community activity center, building 2000, on Jan. 16, 2019, as part of a $5.1 million renovation of the building. Construction completion i... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., continue work on the construction of a salt/sand storage facility April 4, 2019, at Fort McCoy, Wis. Platt Construction received a $555,000 contract to build ... More

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation is shown Oct. 15, 2020, at Fort McCoy, Wis. Contractor MDM Construction, headquartered in Rockford, Ill., is completing upgrades to 11 buildings in the... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 21, 2021, at sunrise at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to bui... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Feb. 19, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 10, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation is shown Nov. 30, 2020, at Fort McCoy, Wis. Contractor MDM Construction, headquartered in Rockford, Ill., is completing upgrades to 11 buildings in the... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is headquartered in Maryville, Tenn., work on constructing new buildings for the installation's Child and Youth Services administration and storage Dec. 28, 2017,... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Sept. 6, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors with Nuvo Construction of Milwaukee work

Contractors with Nuvo Construction of Milwaukee work

Contractors with Nuvo Construction of Milwaukee work on sewer line repair and replacement on the cantonment area on Nov. 27, 2017, at Fort McCoy, Wis. Work on sewer lines has been completed throughout November ... More

Contractors work on a new $13.5 million, 1,428-person

Contractors work on a new $13.5 million, 1,428-person

Contractors work on a new $13.5 million, 1,428-person annual training/mobilization dining facility Sept. 26, 2018, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engine... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 9, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being con... More

Contractors work on a bridge project July 18, 2018,

Contractors work on a bridge project July 18, 2018,

Contractors work on a bridge project July 18, 2018, near Range 2 on North Post at Fort McCoy, Wis. When the bridge is completed, it will complete a 12-kilometer live-fire convoy route between Ranges 29 and 4. T... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the former Community Activity Center, building 2000, on Feb. 1, 2019, as part of a $5.1 million renovation of the building. Construction completion is... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Sept. 20, 2017, at Fort McCoy, Wis. A $9.9 million contract for the new constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Dec. 10, 2020, at sunset where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Construc... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown June 18, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces fo... More

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is headquartered in Maryville, Tenn., work on constructing a new building for the installation's Child and Youth Services administration and storage Oct. 26, 2017... More

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is headquartered in Maryville, Tenn., work on constructing new buildings for the installation's Child and Youth Services administration and storage March 22, 2018... More

Contractors work on a bridge project Aug. 1, 2018,

Contractors work on a bridge project Aug. 1, 2018,

Contractors work on a bridge project Aug. 1, 2018, near Range 2 on North Post at Fort McCoy, Wis. When the bridge is completed, it will complete a 12-kilometer live-fire convoy route between Ranges 29 and 4. Th... More

New rail lines placed to support Fort McCoy's rail

New rail lines placed to support Fort McCoy's rail

New rail lines placed to support Fort McCoy's rail system is shown Aug. 14, 2018, at the rail yard at Fort McCoy, Wis. Fort McCoy’s rail infrastructure has seen improvements in recent years and more work is pla... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Oct. 26, 2018, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Dec. 27, 2019, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown June 18, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the construction of a salt/sand storage facility Jan. 9, 2019, at Fort McCoy, Wis. Platt Construction received a $555,000 contract to build the facili... More

A stretch of road where sections of concrete are being

A stretch of road where sections of concrete are being

A stretch of road where sections of concrete are being replaced is shown Oct. 1, 2019, on East G Street between East 12th Avenue and Washrack Road on the cantonment area at Fort McCoy, Wis. Contractor Kaiyuh Se... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown May 21, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was aw... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown June 4, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infr... More

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings

Contractors work on demolishing several old buildings on the cantonment area Aug. 12, 2019, to make room for the construction of a new $24 million 400-bed, four-story barracks at Fort McCoy, Wis. The demolition... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown Oct. 15, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces fo... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown June 4, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infr... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Aug. 30, 2018, at Fort McCoy, Wis. A $9.9 million contract for the new construc... More

Contractors work on paving a road in the cantonment

Contractors work on paving a road in the cantonment

Contractors work on paving a road in the cantonment area May 7, 2020, at Fort McCoy, Wis. The road paving was part of work being done on several roadways over the three-week period at the installation in April ... More

Construction of a fitness facility at the Fort McCoy

Construction of a fitness facility at the Fort McCoy

Construction of a fitness facility at the Fort McCoy running track is shown Nov. 12, 2020, on the cantonment area at Fort McCoy, Wis. MDM Construction, headquartered in Rockford, Ill., is the contractor for the... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility April 1, 2019, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the former Community Activity Center, building 2000, on Feb. 27, 2019, as part of a $5.1 million renovation of the building. Construction completion i... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 7, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infr... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Sept. 6, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Nov. 24, 2020, during a light snowfall as a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Bla... More

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation

One of several World War II-era buildings under renovation is shown Nov. 30, 2020, at Fort McCoy, Wis. Contractor MDM Construction, headquartered in Rockford, Ill., is completing upgrades to 11 buildings in the... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Aug. 14, 2019, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors work on a new $13.5 million, 1,428-person

Contractors work on a new $13.5 million, 1,428-person

Contractors work on a new $13.5 million, 1,428-person annual training/mobilization dining facility Oct. 30, 2018, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Enginee... More

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis.,

Contractors with Platt Construction of Tomah, Wis., work on the former community activity center, building 2000, on Dec. 19, 2018, as part of a $5.1 million renovation of the building. Construction completion i... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Feb. 5, 2020, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being con... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Dec. 27, 2019, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 22, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility April 4, 2019, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Feb. 5, 2020, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being con... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Sept. 16, 2019, in the 1800 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being c... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Feb. 28, 2018, at Fort McCoy, Wis. A $9.9 million contract for the new construc... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Aug. 1, 2018, at Fort McCoy, Wis. A $9.9 million contract for the new construct... More

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build

Contractors with Nuvo Construction of Milwaukee build a new tower Jan. 24, 2018, on Range 29 on North Post at Fort McCoy, Wis. Range 29 is one of 31 live-fire ranges at the installation. The new tower will be f... More

Crew workers with the McAlester Army Ammunition Plant

Crew workers with the McAlester Army Ammunition Plant

Crew workers with the McAlester Army Ammunition Plant (MCAAP) of McAlester, Okla., work on a section of rail on the cantonment area Aug. 20, 2019, at Fort McCoy, Wis. The work is part of a two-year project to i... More

Contractors work on new cabins Oct. 18, 2018, at Pine

Contractors work on new cabins Oct. 18, 2018, at Pine

Contractors work on new cabins Oct. 18, 2018, at Pine View Campground at Fort McCoy, Wis. Overall, 10 new cabins were being built and placed at the campground in 2018. Open year-round, Pine View Campground is p... More

Contractors prepare a new parking area Nov. 14, 2018,

Contractors prepare a new parking area Nov. 14, 2018,

Contractors prepare a new parking area Nov. 14, 2018, near East 12th Avenue and East M. Street on the cantonment area at Fort McCoy, Wis. The contractor was Allcon Construction of Butler, Wis. Gerke Excavating ... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is

Employees with contractor Relyant Global, which is headquartered in Maryville, Tenn., work on constructing new buildings for the installation's Child and Youth Services administration and storage Jan. 30, 2018,... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Sept. 26, 2018, at Fort McCoy, Wis. A $9.9 million contract for the new constru... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Oct. 1, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infr... More

A pedestrian bridge being constructed by NuGen Johnson

A pedestrian bridge being constructed by NuGen Johnson

A pedestrian bridge being constructed by NuGen Johnson LLC of Sussex, Wis., is shown March 28, 2018, next to the La Crosse River and Pine View Campground at Fort McCoy, Wis. A new bridge is being placed in the ... More

A worker with contractor Kaiyuh Services works on replacing

A worker with contractor Kaiyuh Services works on replacing

A worker with contractor Kaiyuh Services works on replacing sections of concrete Oct. 29, 2019, on East G Street between East 12th Avenue and Washrack Road on the cantonment area at Fort McCoy, Wis. Kaiyuh Serv... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Dec. 20, 2019, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown June 18, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Nov. 24, 2020, during a light snowfall as a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Bla... More

Workers with Mathy Construction of Onalaska work on

Workers with Mathy Construction of Onalaska work on

Workers with Mathy Construction of Onalaska work on the running track in August 2000 at Fort McCoy. The track is a half-mile and allows Soldiers and civilians a safe place to walk or run out of traffic. (U.S. A... More

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood,

Workers with Catamount Constructors, Inc. of Lakewood, Colo., continue construction of the Fort McCoy Access Control Point project Sept. 26, 2018, at Fort McCoy, Wis. A $9.9 million contract for the new constru... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Workers with contractor Relyant Global LLC of Maryville,

Workers with contractor Relyant Global LLC of Maryville,

Workers with contractor Relyant Global LLC of Maryville, Tenn., continue work on a U.S. Army Corps of Engineers-led project May 7, 2020, to build seven new military family housing units at the South Post Housin... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors smooth freshly poured concrete for a new

Contractors smooth freshly poured concrete for a new

Contractors smooth freshly poured concrete for a new sidewalk Oct. 20, 0215, at Fort McCoy, Wis. The work, coordinated by the Directorate of Public Works, is part of ongoing projects to upgrade infrastructure a... More

A salt/sand storage facility that was constructed earlier

A salt/sand storage facility that was constructed earlier

A salt/sand storage facility that was constructed earlier in 2019 by Platt Construction of Tomah, Wis., is shown Nov. 22, 2019, at Fort McCoy, Wis. Platt Construction received a $555,000 contract to build the ... More

Workers with contractor Relyant Global LLC of Maryville,

Workers with contractor Relyant Global LLC of Maryville,

Workers with contractor Relyant Global LLC of Maryville, Tenn., continue work on a U.S. Army Corps of Engineers-led project March 20, 2020, to build seven new military family housing units at the South Post Hou... More

Previous

of 50

Next

The objects in this collection are from The U.S. National Archives and Defense Visual Information Distribution Service. The U.S. National Archives and Records Administration (NARA) was established in 1934 by President Franklin Roosevelt. NARA keeps those Federal records that are judged to have continuing value—about 2 to 5 percent of those generated in any given year. There are approximately 10 billion pages of textual records; 12 million maps, charts, and architectural and engineering drawings; 25 million still photographs and graphics; 24 million aerial photographs; 300,000 reels of motion picture film; 400,000 video and sound recordings; and 133 terabytes of electronic data. The Defense Visual Information Distribution Service provides a connection between world media and the American military personnel serving at home and abroad. All of these materials are preserved because they are important to the workings of Government, have long-term research worth, or provide information of value to citizens.

Disclaimer: A work of the U.S. National Archives and DVIDS is "a work prepared by an officer or employee" of the federal government "as part of that person's official duties." In general, under section 105 of the Copyright Act, such works are not entitled to domestic copyright protection under U.S. law and are therefore in the public domain. This website is developed as a part of the world's largest public domain archive, PICRYL.com, and not developed or endorsed by the U.S. National Archives or DVIDS.  https://www.picryl.com

Developed by GetArchive, 2015-2024