Not developed or endorsed by NARA or DVIDS. Part of the World's largest public domain source PICRYL.com.

dpw

public
630 media by topicpage 2 of 7
Children spend time at the “taste booth,” as they taste

Children spend time at the “taste booth,” as they taste

Children spend time at the “taste booth,” as they taste test organic fruits and vegetables as part of an Earth Day educational event at Oberdachstetten Range Training Area, Germany, April 20, 2016. (U.S. Army p... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family and Morale, Welfare and Recreation, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially di... More

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in... More

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in... More

From left, Evans Marlar, Travis Dodson, Kendra Sultzer,

From left, Evans Marlar, Travis Dodson, Kendra Sultzer,

From left, Evans Marlar, Travis Dodson, Kendra Sultzer, Sharna Tolfree and Ian Smith begin a prescribed burn with a safety briefing to ensure everyone knows where the day's activities will take place, what to e... More

Rick Gravely, the 1st Sustainment Command (Theater)

Rick Gravely, the 1st Sustainment Command (Theater)

Rick Gravely, the 1st Sustainment Command (Theater) deputy safety director, (left), talks about the 2017 Worldwide Ammunition Logistics and Explosives Safety Review timeline in Camp Arifjan, Kuwait, on Jan. 20,... More

Ann Garner, director of the Directorate of Public Works,

Ann Garner, director of the Directorate of Public Works,

Ann Garner, director of the Directorate of Public Works, watches as James Harper with Fort Jackson Family Homes speaks about the money spent on housing repairs during the Community Town Hall Sept. 16.

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 13, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in... More

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

U.S. Army Spc. Lewllyn, an engineer assigned to 1413th

U.S. Army Spc. Lewllyn, an engineer assigned to 1413th

U.S. Army Spc. Lewllyn, an engineer assigned to 1413th Engineer Co., 113th Engineer Battalion, Indiana Army National Guard, trains Afghan National Army soldiers assigned to the 215th Corps, and an Afghan civili... More

A contractor is hauling away scrap metal from a pile

A contractor is hauling away scrap metal from a pile

A contractor is hauling away scrap metal from a pile at the Lamont Landfill on Fort Bragg.

Mr. Navid Ejtehad, an Afghan linguist assigned to the

Mr. Navid Ejtehad, an Afghan linguist assigned to the

Mr. Navid Ejtehad, an Afghan linguist assigned to the 215th Corps Security Force Assistance Advisor Team, explains the functions of a multi-meter to Afghan National Army soldiers, assigned to the 215th Corps, d... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Scrap metal is piled up at the Lamont Landfill on Fort

Scrap metal is piled up at the Lamont Landfill on Fort

Scrap metal is piled up at the Lamont Landfill on Fort Bragg.

U.S. Army Sgt. Stallard, an engineer assigned to 1413th

U.S. Army Sgt. Stallard, an engineer assigned to 1413th

U.S. Army Sgt. Stallard, an engineer assigned to 1413th Engineer Co., 113th Engineer Battalion, Indiana Army National Guard, trains Afghan National Army soldiers assigned to the 215th Corps, and an Afghan civil... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown July 16, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces fo... More

Chuck A. Walls, U.S. Army Garrison Ansbach deputy to

Chuck A. Walls, U.S. Army Garrison Ansbach deputy to

Chuck A. Walls, U.S. Army Garrison Ansbach deputy to the garrison commander, visits the Earth Day educational event April 20, 2016, at Oberdachstetten Range Complex (U.S. Army photo by Georgios Moumoulidis, TSC... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 18, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family and Morale, Welfare and Recreation, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially di... More

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as

Chaplain (Maj.) Robert Rand, garrison chaplain, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 29, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

The Honorable Dr. Francis J. Harvey, Secretary of the Army (SECARMY), walks though several new and remodeled homes at the McNair Village Model Home site at Fort Hood, Texas (TX), during his official two-day tour and visit of the units, manpower, and facilities at Fort Hood. Accompanying the SECARMY is Mr. Rod Chisholm (far left) Director, Directorate of Public Works (DPW); Dr, Harvey, SECARMY; Mr. Robert Erwin (second from right), Family Housing DPW Representative; and US Army (USA) Major General (MGEN) James E. Simmons (far right), Deputy Commander, III Corps

The Honorable Dr. Francis J. Harvey, Secretary of the Army (SECARMY), ...

The original finding aid described this photograph as: Base: Fort Hood State: Texas (TX) Country: United States Of America (USA) Scene Camera Operator: Grazyna Musick, CIV, USA Release Status: Released to ... More

Lyons, Mich., July 25, 2013 --Susan Craft, DPW Maintenance Superintendent, points out to FEMA Project Specialist Ron Hamilton how the bridge is endangered by the loss of riprap during the flooding of the river.  FEMA Public Assistance Grants are available following application and inspection, to cover at least 75% of the cost of repair. Photo by Marilee Caliendo/FEMA

Lyons, Mich., July 25, 2013 --Susan Craft, DPW Maintenance Superintend...

The original finding aid described this as: Date Taken: 2013-07-25 00:00:00 UTC Photographer Name: Marilee Caliendo City/State: Lyons, MI Disaster Types: Dam/Levee Break ^ Flooding Categories: Mitigation ^... More

Dr. Laurie Rush, Fort Drum Cultural Resources manager,

Dr. Laurie Rush, Fort Drum Cultural Resources manager,

Dr. Laurie Rush, Fort Drum Cultural Resources manager, was among 15 civilian employees across the Army who were honored with a U.S. Army Installation Management Command (IMCOM) Stalwart Award during a virtual c... More

New Fort Knox DPW director ready to be ‘servant to all’

New Fort Knox DPW director ready to be ‘servant to all’

Fort Knox Directorate of Public Works Director Jason Root started work at the beginning of the year and already has been instrumental in helping maintain the installation’s legacy of excellence.

The cantonment area is shown in this night aerial image

The cantonment area is shown in this night aerial image

The cantonment area is shown in this night aerial image at Fort Bragg, N.C. Feb. 21, 2013. The post's Directorate of Public Works partnered with the members of the Army Reserve’s Alpha Company, 1st Battalion, ... More

Ian Smith, Fort Jackson Forestry Branch Fire Management

Ian Smith, Fort Jackson Forestry Branch Fire Management

Ian Smith, Fort Jackson Forestry Branch Fire Management Officer, sets a test burn in an area to verify which way the wind is blowing. (Photo Credit: Mr. Ron Lester (Fort Jackson))

Spc. Margarita Grooms (center), a food service specialist

Spc. Margarita Grooms (center), a food service specialist

Spc. Margarita Grooms (center), a food service specialist with 1st Battalion, 44th Air Defense Artillery Regiment, 69th ADA Brigade, is recognized by Col. Brian Gibson (right), the 69th ADA Bde. commander, and ... More

The Equipment Concentration Site warehouse at Lt. Col.

The Equipment Concentration Site warehouse at Lt. Col.

The Equipment Concentration Site warehouse at Lt. Col. Hernean G. Pasquera Army Reserve Center in Juana Diaz, Puerto Rico, underwent a complete remodel after it was devastated by Hurricane Maria.

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

James Wenger, Assistant Chief for the Area Support

James Wenger, Assistant Chief for the Area Support

James Wenger, Assistant Chief for the Area Support Group – Kuwait joint emergency service station, (left), shows James Lyndsey, an Explosives Safety Specialist with the U.S. Army Defense Ammunition Center, (rig... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family

Patric McGuane, director of the Directorate of Family and Morale, Welfare and Recreation, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially di... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 29, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Mariana and Gio Santos, and their mother, Rachel Warren

Mariana and Gio Santos, and their mother, Rachel Warren

Mariana and Gio Santos, and their mother, Rachel Warren try to identify the difference between dragonfly and damselfly larva at a display by the Fort Hood Department of Public Works at the Fort Hood Earth Day c... More

Officials from Fort Knox’s Directorate of Public Works

Officials from Fort Knox’s Directorate of Public Works

Officials from Fort Knox’s Directorate of Public Works have announced they will be installing a four-way stop at the intersection of Dixie Street and 11th Armored Division Avenue to provide safer, smoother traf... More

200422-A-BV362-0031 CAMP WALKER, Republic of Korea.

200422-A-BV362-0031 CAMP WALKER, Republic of Korea.

200422-A-BV362-0031 CAMP WALKER, Republic of Korea. (April 22, 2020) The United States Army Garrison Directorate of Public Works collects hazardous waste in support of Earth Day at Camp Walker April, 22. DPW in... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown July 16, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces fo... More

A Trimble R8 base station collects satelite signals

A Trimble R8 base station collects satelite signals

A Trimble R8 base station collects satelite signals and relays positioning data between several R8 rovers on a survey site. U.S. Army Reserve Soldiers from the 650th Engineer Detachment (Survey & Design), from ... More

An image of a Fort Bragg barracks provides a visual

An image of a Fort Bragg barracks provides a visual

An image of a Fort Bragg barracks provides a visual for DPW crew members who conducted work orders in the barracks during COVID-19 as they prepared for appropriate PPE for isolation and quarantine areas. (Photo... More

Rachel Warren and her kids watch the monarch butterflies

Rachel Warren and her kids watch the monarch butterflies

Rachel Warren and her kids watch the monarch butterflies as they fly around a portable butterfly garden at the Fort Hood Earth Day celebration, April 25. The Fort Hood Department of Public Works featured a disp... More

Workers with the Fort McCoy, Wis., Directorate of Public

Workers with the Fort McCoy, Wis., Directorate of Public

Workers with the Fort McCoy, Wis., Directorate of Public Works load dump trucks with dirt April 6, 2016, at a North Post staging as part of loading and hauling operations for a project. Most earth-moving projec... More

Maj. Gen. John Evans Jr., commanding general of Fort

Maj. Gen. John Evans Jr., commanding general of Fort

Maj. Gen. John Evans Jr., commanding general of Fort Knox, addresses a concern from a resident during a one-hour listening session conducted by installation leaders and housing managers March 1, 2019. Many of t... More

Contractors work on an infrastructure project May 21,

Contractors work on an infrastructure project May 21,

Contractors work on an infrastructure project May 21, 2020, at Fort McCoy, Wis. Installation infrastructure improvements take place every year at Fort McCoy and are coordinated by the Fort McCoy Directorate of ... More

FORT BENNING, Ga. – Fort Benning firefighters practice

FORT BENNING, Ga. – Fort Benning firefighters practice

FORT BENNING, Ga. – Fort Benning firefighters practice fundamental firefighting skills at the former residences at Ragin Court on main post Nov. 16. The buildings at Ragin Court had been scheduled for demolitio... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 10, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Paul Bijhouwer, a civil engineer with the Army Corps

Paul Bijhouwer, a civil engineer with the Army Corps

Paul Bijhouwer, a civil engineer with the Army Corps of Engineer, Buffalo District, inspects for any damage of the Bird Island Pier’s foundation November 6, 2019. The Army Corps of Engineers, Buffalo District, ... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Children spend time at the “taste booth,” as they taste

Children spend time at the “taste booth,” as they taste

Children spend time at the “taste booth,” as they taste test organic fruits and vegetables as part of an Earth Day educational event at Oberdachstetten Range Training Area, Germany, April 20, 2016. (U.S. Army p... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown July 16, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces fo... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 10, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 4, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barra... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

U.S. military personnel, Afghan National Army (ANA)

U.S. military personnel, Afghan National Army (ANA)

U.S. military personnel, Afghan National Army (ANA) soldiers assigned to the 215th Corps,, an Afghan civilian from the Department of Public Works and an Afghan linguist assigned to the 215th Corps Security Forc... More

A firefighter from the U.S. Army Garrison Ansbach

A firefighter from the U.S. Army Garrison Ansbach

A firefighter from the U.S. Army Garrison Ansbach Directorate of Emergency Services explains the responsibilities of being a firefighter April 20, 2016. This was part of an Earth Day educational event at Oberda... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 28, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Feb. 18, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Mark Reaves, physical security chief for the Directorate

Mark Reaves, physical security chief for the Directorate

Mark Reaves, physical security chief for the Directorate of Emergency Services, as well as other Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced me... More

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family

Fort McCoy community members and friends and family of James C. Hamilton III gathered for a socially distanced memorial service Aug. 14, 2020, in building 905 at Fort McCoy, Wis. Hamilton was the former directo... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Jan. 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment

Renovation work on building 2880 on the cantonment area at Fort McCoy, Wis., is shown May 7, 2020. This former facility used by a Navy Reserve Seabees unit is undergoing the renovation to create new spaces for ... More

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient

Construction of a new multi-million dollar transient troop training barracks is shown Jan. 26, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barr... More

Previous

of 7

Next

The objects in this collection are from The U.S. National Archives and Defense Visual Information Distribution Service. The U.S. National Archives and Records Administration (NARA) was established in 1934 by President Franklin Roosevelt. NARA keeps those Federal records that are judged to have continuing value—about 2 to 5 percent of those generated in any given year. There are approximately 10 billion pages of textual records; 12 million maps, charts, and architectural and engineering drawings; 25 million still photographs and graphics; 24 million aerial photographs; 300,000 reels of motion picture film; 400,000 video and sound recordings; and 133 terabytes of electronic data. The Defense Visual Information Distribution Service provides a connection between world media and the American military personnel serving at home and abroad. All of these materials are preserved because they are important to the workings of Government, have long-term research worth, or provide information of value to citizens.

Disclaimer: A work of the U.S. National Archives and DVIDS is "a work prepared by an officer or employee" of the federal government "as part of that person's official duties." In general, under section 105 of the Copyright Act, such works are not entitled to domestic copyright protection under U.S. law and are therefore in the public domain. This website is developed as a part of the world's largest public domain archive, PICRYL.com, and not developed or endorsed by the U.S. National Archives or DVIDS.  https://www.picryl.com

Developed by GetArchive, 2015-2024