An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 10, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 10, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the

Work on five new battle simulations buildings in the 200 block is shown Oct. 15, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related inf... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 10, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Aug. 20, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 2, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Aug. 20, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual

Contractors work on a new 1,428-person annual training/mobilization dining facility Jan. 16, 2019, in the 2400 block at Fort McCoy, Wis. The project, coordinated by the U.S. Army Corps of Engineers, is being co... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 17, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 22, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 2, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 30, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 23, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Sept. 15, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was ... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown Oct. 22, 2020, at sunrise where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constru... More

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was a... More

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project

Contractors work on the Fort McCoy Main Gate project Sept. 16, 2019, at Fort McCoy, Wis. The design and construction of this project is being handled by the Army Corp of Engineers, Omaha District. The project w... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03

Contractors with Relyant Global LLC work on a new $7.03 million shipping, receiving, and mail freight facility April 29, 2020, at Fort McCoy, Wis. The contract for the project calls for the construction of a pr... More

Previous

of 5

Next

The objects in this collection are from The U.S. National Archives and Defense Visual Information Distribution Service. The U.S. National Archives and Records Administration (NARA) was established in 1934 by President Franklin Roosevelt. NARA keeps those Federal records that are judged to have continuing value—about 2 to 5 percent of those generated in any given year. There are approximately 10 billion pages of textual records; 12 million maps, charts, and architectural and engineering drawings; 25 million still photographs and graphics; 24 million aerial photographs; 300,000 reels of motion picture film; 400,000 video and sound recordings; and 133 terabytes of electronic data. The Defense Visual Information Distribution Service provides a connection between world media and the American military personnel serving at home and abroad. All of these materials are preserved because they are important to the workings of Government, have long-term research worth, or provide information of value to citizens.

Disclaimer: A work of the U.S. National Archives and DVIDS is "a work prepared by an officer or employee" of the federal government "as part of that person's official duties." In general, under section 105 of the Copyright Act, such works are not entitled to domestic copyright protection under U.S. law and are therefore in the public domain. This website is developed as a part of the world's largest public domain archive, PICRYL.com, and not developed or endorsed by the U.S. National Archives or DVIDS.  https://www.picryl.com

Developed by GetArchive, 2015-2024