A contractor performs electrical mapping of the new
Summary
A contractor performs electrical mapping of the new barracks under construction at Naval Air Station Patuxent River Jul. 31 2019. The barracks is being built by NAVFAC Washington and its contracting partners and will feature 73 two-bedroom units for unaccompanied enlisted Sailors. Construction is set to be completed in Aug. 2020.
Tags
navfac
engineer
electrical
cec
navy
washington
construction
maryland
civil engineer corps
matthew stinson
naval facilities engineering command washington
patuxent river
electrical mapping during construction of modern barracks at naval air station patuxent river
dvids
ultra high resolution
high resolution
maps
workers
building construction
contractors
Date
31/07/2019
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright