A crane moves a 249-ton rotor for its installation
Summary
A crane moves a 249-ton rotor for its installation into hydropower unit two at Center Hill Dam in Lancaster, Tenn., June 19, 2017. The U.S. Army Corps of Engineers Nashville District is rehabilitating the unit and expects to bring it online in late July after the completion of its assembly and load testing. (USACE photo by Leon Roberts)
- Crew installs 249-ton hydropower rotor at Center Hill Dam
- Crew installs 249-ton hydropower rotor at Center Hill Dam - DVIDS
- Crew installs 249-ton hydropower rotor at Center Hill Dam ... - DVIDS
- A crane designed to lift 250 tons removes a hydropower
- US Army engineers use an MT250 25-ton truck mounted hydraulic ...
Tags
rotor
safety
lancaster
usace
tennessee
rehabilitation
generator
corps of engineers
nashville district
hydropower
center hill
center hill dam
caney fork river
voith hydro
voith
hydroelectric power
cumberland river system hydropower rehabilitation
rotor installation
hydropower generator
leon roberts
crew installs 249 ton hydropower rotor at center hill dam
dvids
ultra high resolution
high resolution
us army corps of engineers
Date
19/06/2017
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright