visibility Similar

code Related

A crowd gathers to view the first production model B-1B aircraft during the rollout ceremony at the Rockwell International facility

description

Summary

The original finding aid described this photograph as:

Base: Palmdale

State: California (CA)

Country: United States Of America (USA)

Scene Camera Operator: MSGT Mike Dial

Release Status: Released to Public

Combined Military Service Digital Photographic Files

B-1 Lancer is a supersonic variable-sweep wing, heavy bomber built by Rockwell and used by the United States Air Force. It is commonly called the "Bone" (from "B-One"). It is one of three strategic bombers in the U.S. Air Force fleet as of 2018, the other two being the B-2 Spirit and the B-52 Stratofortress. The B-1 was first envisioned in the 1960s as a platform that would combine the Mach 2 speed with the range and payload of the B-52. After a long series of studies, Rockwell International (now part of Boeing) won the design contest for what emerged as the B-1A. This version had a top speed of Mach 2.2 at high altitude and the capability of flying for long distances at Mach 0.85 at very low altitudes. The introduction of cruise missiles and early work on the stealth bombers led to the program being canceled in 1977. The program was restarted in 1981, largely as an interim measure due to delays in the B-2 stealth bomber program, with the B-2 eventually reaching initial operational capability in 1997. This led to a redesign as the B-1B, which differed from the B-1A by having a lower top speed at a high altitude of Mach 1.25, but improved low-altitude performance of Mach 0.96. The electronics were also extensively improved during the redesign, and the airframe was improved to allow takeoff with the maximum possible fuel and weapons load. The B-1B began deliveries in 1986 and formally entered service with Strategic Air Command (SAC) as a nuclear bomber in that same year. By 1988, all 100 aircraft had been delivered. Originally designed for nuclear capabilities, the B-1 switched to an exclusively conventional combat role in the mid-1990s.

label_outline

Tags

crowd view production model first production model b aircraft b aircraft rollout ceremony rollout ceremony rockwell international facility california b 1 b bomber bomber jet aircraft high resolution first production model b 1 b aircraft rockwell international facility msgt mike dial bomber military aircraft us national archives
date_range

Date

04/09/1984
collections

in collections

B-1B Lancer

“The Bone,” the B-1B Lancer - a long-range, supersonic bomber
place

Location

create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Rockwell International Facility, First Production Model B 1 B Aircraft, First Production Model B

A right side view of an FB-111A aircraft of the 509th Bombardment Wing as it takes off

A rear view of an E-4B aircraft taking off as two other aircraft sit on the flight line

A B-1B Lancer from the 405th Air Expeditionary Wing rolls out for take off on a combat mission during Operation ENDURING FREEDOM

An air-to-air overhead view of a 563rd Tactical Fighter Squadron F-4G Wild Weasel aircraft refueling as seen from the boom operator's station aboard a KC-135 Stratotanker aircraft during Exercise TEAM SPIRIT '85

Attending a news conference during the rollout of the first production model B-1B aircraft are, seated from left to right; Gerald Gimness, B-1 program manager, Boeing Military Airplane Co.; Ned A. Hope, general manager, F101 Project Department, General Electric Co.; Major General (MGEN) William Thurman, B-1B program manager, Wright-Patterson Air Force Base; and John L. Canfalone, vice president, B-1B program, Eaton Corp

B-1B Lancer, a multi-role, long range bomber, on static display in support of the Supreme Allied Commander, Atlantic (SACLANT) Seminar held at Langley AFB, Virginia. The SACLANT Seminar was attended by 100 delegates from 18 countries, the purpose was to bring NATO leaders together to discuss issues from a Maritime and North American perspective and give leaders a hands on opportunity

An air-to-air right side view of a Soviet Su-27 Flanker aircraft

SGT. Lee E. DuBry of the 28th Munitions Maintenance Squadron checks connectors with a probe before a practice bomb is loaded into a B-1B aircraft. The bomber is participating in Phase II of exercise Proud Shield '88, in which KC-135 Stratotanker aircraft and B-1B crews conduct navigation, bombing and refueling competitions

A comparison chart of Soviet and NATO aircraft production for 1980 to 1984. From Soviet Military Power 1985

Kelly Johnson, developer of the original U-2 reconnaissance aircraft presents models of its successor, the new TR-1 aircraft (background) to LGEN James P. Mullins and LGEN John G. Albert during its rollout ceremony. LGEN Mullins is the new commander of the Air Force Acquisition Logistics Command and LGEN Albert is the former commander

A right front view of an EF-111A aircraft being towed out of a hangar for a rollout ceremony. The aircraft was converted from an F-111 model aircraft at the Grumman Riverhead Plant, Grumman Aerospace Corporation

Apache Chairman Ronnie Lupe (middle) gives the traditional

Topics

crowd view production model first production model b aircraft b aircraft rollout ceremony rollout ceremony rockwell international facility california b 1 b bomber bomber jet aircraft high resolution first production model b 1 b aircraft rockwell international facility msgt mike dial bomber military aircraft us national archives