visibility Similar

code Related

An area of the 1600 block of the cantonment area of

description

Summary

An area of the 1600 block of the cantonment area of the installation is shown Aug. 20, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barracks in September 2019. The planned completion date is currently August 2021. The planned barracks will be different than the traditional barracks that are located throughout the installation. This new building will be four stories and be able to house 400 people in approximately 60,000 square feet. The project also is the first of eight new buildings planned for the entire 1600 block. The plan is to build three more barracks with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This is an Army Corps of Engineers-managed project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

label_outline

Tags

wisconsin army corps of engineers construction fort mccoy military construction army barracks l s black constructors barracks construction scott sturkol fort mccoy public affairs office army corps of engineers led projecct to build new barracks continues at fort mccoy dvids ultra high resolution high resolution fort mccoy wisconsin building construction contractors
date_range

Date

20/08/2020
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Army Corps Of Engineers Led Projecct To Build New Barracks Continues At Fort Mccoy, L S Black Constructors, Army Barracks

Airmen from the 378th Expeditionary Civil Engineer

U.S. Navy Hospital Corpsman 2nd Class Nathan Cantrelle

Members of the 322nd Engineer Company, hone their military

A U.S. Air Force civil engineer repairs steps in front

New York, NY, March 26, 2020--FEMA is working with

US Army (USA) Corps of Engineers (USACE) Civilian, Billy Sellin (left, center in uniform), Resident Engineer, Balad Air Base (AB) Resident Office, Gulf Region North (GRN), speaks with several civilian subcontractors about the construction progress of the new medical supply warehouse at the Logistical Support Area (LSA) Balad, Balad Air Base (AB), Salah Ad Din Province, Iraq (IRQ), during Operation IRAQI FREEDOM

United States Coast Guard photo - SECURITY PATROL

Flooding ^ Hurricane/Tropical Storm - Spanish Grant, Texas, April 15, 2010 -- Workers remove insulation from a home that was bought out as part of the Federal buyout program. The house is being torn down as part of the program being sponsored by FEMA and he State of Texas. Photo by Patsy Lynch/FEMA

Sgt. 1st Class Bernd Kollmann, 212th Engineer Company,

Terrorism ^ Tornado - Sipsey, Ala. , May 24, 2011 -- A member of the US Army Corps of Engineers monitors vegetative debris deposits by county and state debris removal contractors at this Corps debris staging area. FEMA Public Assistance funds may reimburse a portion of debris removal costs, after application and eligibility determination. FEMA and the Corps are partners in debris removal. George Armstrong/FEMA

U.S. Army Corps of Engineers (USACE) photograph by

Contractors prepare the ground for a new layer of asphalt

Topics

wisconsin army corps of engineers construction fort mccoy military construction army barracks l s black constructors barracks construction scott sturkol fort mccoy public affairs office army corps of engineers led projecct to build new barracks continues at fort mccoy dvids ultra high resolution high resolution fort mccoy wisconsin building construction contractors