visibility Similar

code Related

Artwork: "Bridge Nearing Completion," 1936. Artist: Handel-Mazzetti. Catalog Number: G.O.1.2580.47. US Army Art Collection

description

Summary

The original finding aid described this photograph as:

Country: Unknown

Scene Camera Operator: Unknown

Release Status: Released to Public

Combined Military Service Digital Photographic Files

label_outline

Tags

artwork bridge completion artist handel mazzetti catalog catalog number army art collection public domain art us army high resolution army art collection industrial history construction sites bridge construction us national archives
date_range

Date

01/01/1984
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Bridge Construction, Catalog Number, Catalog

Members of the Colorado Air National Guard's 240th

Before Completion of House of William Larvie - Bureau of Indian Affairs

An aerial stern view of the guided missile frigate DUNCAN (FFG 10) at 90 percent completion

Two 143-square-meter health clinics are taking shape for the Iraqi Army at Taji Military Base in Iraq. The East Clinic is 75% complete with the crew there installing electrical lights and ceiling tiles. At the West Clinic, floor tiles are being set in place. At both clinics, final grade around the structures is being worked. The $3 million contract was awarded July 7, 2004, with an expected completion date of Aug. 25, 2005. A crew of about 35 Iraqis are working at both projects. Each health clinic will feature five exam rooms and one isolation room. (U.S. Army photo by Norris Jones) (Released)

Farrans Construction started building the estimated thirty-one million dollar, 416 room, one to one dormitory on Royal Air Force, Lakenheath, United Kingdom. A one to one room consists of a separate bedroom and bathroom with a connected kitchen. Construction started on 4 November 1997, estimated completion date is 17 July 2000. (long view)

[Highlight views compiled to publicize] economic recovery [efforts]: New Orleans, Louisiana

Spc. Jason Marlowe (right), from Wisconsin and Spc.

Two large Poster Signs stand on the site for the new United States Embassy in Panama before the start of the Groundbreaking Ceremony in Panama City, Panama. The 24-acre compound will be one of the largest diplomatic facilities in the Americas at a cost of 70-million dollars. This project is scheduled for completion in February 2007

The US Naval Reserve Readiness Center, located on Lake Union waterfront, after completion of a $1.5 million renovation

U.S. Army Corps of Engineers Buffalo District contractor

Flooding ^ Severe Storm - Douglasville, Ga. , October 5, 2009 -- Small Business Administration Public Information Officer Richard Daigle confers with Customer Service Representatives Carol Dueker and Shery Lavelle in preparation for today's opening of a Business Recovery Center where loan applications, completion assistance, and information will be provided. FEMA and the Small Business Administration are partners in responding to the September severe storms and flooding. George Armstrong/FEMA

[Assignment: 48-DPA-07-25-08_SOI_K_Boston] Visit of Secretary Dirk Kempthorne to the Old State House in Boston, Massachusetts, [where he joined National Park Service Director Mary Bomar, Boston National Historical Park Superintendent Terry Savage, Bostonian Society Executive Director Brian LeMay, Boston Environmental and Energy Services Chief James Hunt III, and other officials at event marking the completion of the initial phase of the Old State House restoration, including restoration of the building's famous tower [48-DPA-07-25-08_SOI_K_Boston_IOD_1128.JPG]

Topics

artwork bridge completion artist handel mazzetti catalog catalog number army art collection public domain art us army high resolution army art collection industrial history construction sites bridge construction us national archives