visibility Similar

code Related

Completion of backfill facing East [Potential Release Site 441 - Railroad Yard]

description

Summary

Photographs Documenting Environmental Cleanup Operations at the Mound Site in Miamisburg, Ohio

Nothing Found.

label_outline

Tags

completion backfill release site release site railroad yard ohio high resolution potential release site mound site environmental cleanup operations railroad yard us national archives
date_range

Date

15/07/2009
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Railroad Yard, Release Site, Potential Release Site

Sgt. David White from Wilmington uses a bobcat to get

Before Completion of House of William Larvie - Bureau of Indian Affairs

Two 143-square-meter health clinics are taking shape for the Iraqi Army at Taji Military Base in Iraq. The East Clinic is 75% complete with the crew there installing electrical lights and ceiling tiles. At the West Clinic, floor tiles are being set in place. At both clinics, final grade around the structures is being worked. The $3 million contract was awarded July 7, 2004, with an expected completion date of Aug. 25, 2005. A crew of about 35 Iraqis are working at both projects. Each health clinic will feature five exam rooms and one isolation room. (U.S. Army photo by Norris Jones) (Released)

NASA PLUM BROOK NUCLEAR REACTOR - DECOMMISSIONING

Operable Unit-1 Landfill Area looking south from Potential Release Site 441 [Railroad Yard] [Operable Unit-1 - Landfill Area]

Farrans Construction started building the estimated thirty-one million dollar, 416 room, one to one dormitory on Royal Air Force, Lakenheath, United Kingdom. A one to one room consists of a separate bedroom and bathroom with a connected kitchen. Construction started on 4 November 1997, estimated completion date is 17 July 2000. (long view)

Workers with the Defense Non-Tactical Generator and

Two large Poster Signs stand on the site for the new United States Embassy in Panama before the start of the Groundbreaking Ceremony in Panama City, Panama. The 24-acre compound will be one of the largest diplomatic facilities in the Americas at a cost of 70-million dollars. This project is scheduled for completion in February 2007

Auxiliary machinery room No.1 aboard the guided missile frigate RODNEY M. DAVIS (FFG 60) at 40 percent completion

Flooding ^ Hurricane/Tropical Storm ^ Severe Storm - Mandeville, La. , Sep. 10, 2012 -- Daniel LLargues, a FEMA PIO talks to Steve Martin, a homeowner in the old section of Mandeville, La. Martin's home suffered water damage when Hurricane Isaac pushed water into his yard. The Martin's lost electrical power but their home was saved because it was elevated. FEMA is working with local, state and other federal agencies to provide assistance to homeowners who want to raise their homes to the current recommended height of at least 12 feet above the ground. Photo by Patsy Lynch/FEMA

A US Army, 24th Battalion soldier uses hand signals to direct a rough terrain fork lift onto a railroad flat car at Fort Eustis, VA, during Joint Logistics Over-The-Shore (JLOTS) Exercise, NATIVE ATLAS 02

An interior view of auxiliary machine room No. 1 on the guided missile frigate USS CROMMELIN (FFG 37) at 80 percent completion

Topics

completion backfill release site release site railroad yard ohio high resolution potential release site mound site environmental cleanup operations railroad yard us national archives