visibility Similar

code Related

INSTALLATION OF SHEET METAL WORK IN THE 8X6 FOOT WIND TUNNEL MODEL PREPARATIONS AREA

description

Summary

The original finding aid described this as:

Capture Date: 2/21/1975

Photographer: DONALD HUEBLER

Keywords: Larsen Scan

Location Building No: 54

Photographs Relating to Agency Activities, Facilities and Personnel

Nothing Found.

label_outline

Tags

installation sheet metal sheet metal foot model preparations nasa wind tunnel national aeronautics and space administration high resolution ultra high resolution foot wind tunnel model preparations area photographer donald huebler nasa photographs 1970 s space program us national archives
date_range

Date

1975
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Foot Wind Tunnel Model Preparations Area, Sheet Metal, Sheet

CONFIGURATION AND INSTALLATION OF 5.5 INCH SONIC INLET IN THE 9X15 FOOT WIND TUNNEL

[Assignment: 48-DPA-08-07-08_SOI_K_NIFC] Visit of Secretary Dirk Kempthorne to the National Interagency Fire Center in Boise, Idaho, [where he joined Homeland Security Secretary Michael Chertoff, Idaho Lieutenant Governor Jim Risch, and other officials for meetings, tours of the facility and surrounding area, and press conference on fire season preparations] [48-DPA-08-07-08_SOI_K_NIFC_DOI_6230.JPG]

[Assignment: 48-DPA-08-07-08_SOI_K_NIFC] Visit of Secretary Dirk Kempthorne to the National Interagency Fire Center in Boise, Idaho, [where he joined Homeland Security Secretary Michael Chertoff, Idaho Lieutenant Governor Jim Risch, and other officials for meetings, tours of the facility and surrounding area, and press conference on fire season preparations] [48-DPA-08-07-08_SOI_K_NIFC_DOI_6327.JPG]

Asbury Park, N.J., Jan. 17, 2013 -- The Calvary Chapel Relief volunteers, a FEMA Voluntary Organizations Active in Disasters (VOAD) organization, works tirelessly on the Asbury Park boardwalk removing damaged boards while prepping the walk for the installation of new boards. VOAD is the forum where organizations share knowledge and resources throughout the disaster cycle to help disaster survivors and their communities. Adam DuBrowa/FEMA

Dam/Levee Break ^ Severe Storm ^ Winter Storm - Oxbow, N. D. , April 6, 2009 --Joe Shoemaker, a representative from the U. S. Army Corps of Engineers discusses placement of sand bags in Oxbox, ND. with members of the Oxbow city engineers. Karl Berg, another representative from the Corps stands behind him. The Corps has been advising and assiting the residents of Oxbow with their flood preparations. Oxbow citizens are preparing for the possibility of additional flooding later in the week. Photo by Patsy Lynch/FEMA

PRATT AND WHITNEY P&W COANNULAR NOZZLE TEST IN THE 8X6 FOOT WIND TUNNEL

Airman 1st Class Tashma Antoine, an aircraft metals

ENGINE INSTALLATION, NASA Technology Images

U.S. Army Corps of Engineers South Pacific Border District

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

[Tropical Storm Fay] Orlando, FL, August 19,2008 -- In side the State of Florida Division Emergency Management Logistics Response Center. A 200,000 square foot, two story, four climate controlled, high security cross dock facility with 27 loading docks. Is being utilized to support state residents during Tropical Storm Fay. Barry Bahler/FEMA

8X6 FOOT WIND TUNNEL FOR LEWIS NEWS NEWSLETTER STORY ABOUT THE 30TH ANNIVERSARY

Topics

installation sheet metal sheet metal foot model preparations nasa wind tunnel national aeronautics and space administration high resolution ultra high resolution foot wind tunnel model preparations area photographer donald huebler nasa photographs 1970 s space program us national archives