visibility Similar

code Related

S128E007118 - STS-128 - Multi- Purpose Logistics Module (MPLM) Unberth to Installation from Robotics Workstation (RWS)

description

Summary

The original finding aid described this as:

Description: View of Chris Fuglesang and Tim Kopra in the US Laboratory during SSRMS OPS to unberth the Multi- Purpose Logistics Module (MPLM) to the install position for nadir Common Berthing Mechanism (CBM) of Node 2 Harmony mate during STS-128. Kopra holds MPLM Resupply Transfer book.

Subject Terms: Astronauts, STS-128, Multi-Purpose Logistics Modules, Installing, Robotics

Date Taken: 8/31/2009

Categories: Onboard Operations

Interior_Exterior: Interior

Ground_Orbit: On-orbit

Element: U.S. Laboratory

Original: Digital Still

Preservation File Format: TIFF

STS-128

label_outline

Tags

multi purpose logistics module multi purpose logistics module mplm unberth installation robotics workstation robotics workstation rws nasa sts 128 discovery high resolution ultra high resolution sts 128 multi purpose logistics modules tiff sts 128 laboratory install position tim kopra preservation file format chris fuglesang kopra ssrms ops nadir common harmony mate transfer book onboard operations astronauts space program
date_range

Date

2009
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Install Position, Nadir Common, Unberth

Topics

multi purpose logistics module multi purpose logistics module mplm unberth installation robotics workstation robotics workstation rws nasa sts 128 discovery high resolution ultra high resolution sts 128 multi purpose logistics modules tiff sts 128 laboratory install position tim kopra preservation file format chris fuglesang kopra ssrms ops nadir common harmony mate transfer book onboard operations astronauts space program