visibility Similar

code Related

Val Fitch plunging target. Photograph taken August 26, 1958. Bevatron-1595

description

Summary

Digital Preservation File Name and Format: 434-LB-6-XBD201304-02523.TIF

Photographs Documenting Scientists, Special Events, and Nuclear Research Facilities, Instruments, and Projects at the Berkeley Lab

Nothing Found.

label_outline

Tags

val fitch val fitch target bevatron nuclear research nuclear research facilities berkeley laboratory berkeley lab high resolution digital preservation file name special events atomic energy laboratory science us national archives industrial history
date_range

Date

1958
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

Restricted - Possibly Specific Use Restriction: Copyright Note: The University of California, as the Department of Energy contractor managing the historical image scanning project, has asserted a continuing legal interest in the digital versions of the images included in the NARA accession, and, accordingly, has stipulated that anyone intending to use any of these digital images for commercial purposes, including textbooks, commercial materials, and periodicals, must obtain prior permission from the University of California-Lawrence Berkeley National Lab, through photo@lbl.gov.

label_outline Explore Fitch, Target, Bevatron

Linear accelerator injector. Bevatron accelerator technicians checking vacuum system and electronics technicians checking oscillators. Photograph taken March 12, 1953

A pair of Marine Corps Super AH-1W Super Cobra Attack helicopters line up at a target range as one fires a TOW missile at a designated target on an Egyptian firing range just outside of Mubarak Military City in Egypt. Marines from the 1ST Tank Battalion, 29 Palms, California, conducted an In-Stride Breech live fire demonstration in front of numerous nations as part of coalition training for this year's BRIGHT STAR 01-02 exercise. An In-Stride Breach is a special type of operation used to overcome and breakthrough unexpected or lightly defended obstacles. BRIGHT STAR is a multinational exercise involving more than 74,000 troops from 44 countries that is designed to enhance regional...

Glenn Seaborg adjusts a Geiger-Muller counter during his search for plutonium at the Radiation Laboratory. Morgue 1956-6 (P-30), 1941 [Photographer: Donald Cooksey]

A nighttime view of a magnesium flare fired above a target range during a live fire Exercise"MAD MOMENT."

Linac II disassembly in Building 64. Photograph taken September 11, 1962. Bevatron-2943 – Photographer: George Kagawa

An elevated bow view of two Oliver Hazard Perry class guided missile frigates under construction at Bath Iron Works Corp. Shipyard. The USS JOHN L. HALL (FFG 32), approximately 90 percent complete, is to the right, and the USS AUBREY FITCH (FFG 34), 80 percent complete, is to the left

Members of the 544th Target Materials Squadron work inside a lab to research a target by finding the coordinates for specific points during Exercise GLOBAL SHIELD '84

A 16-inch projectile lands near the bow of the target ship being fired at by the battleships USS NEW JERSEY (BB-62) and USS MISSOURI (BB-63) during Fleet Exercise '89

Torturing pole plates for 184-inch cyclotron magnet. Photo taken 2/12/1946. 184"-155 Principal Investigator/Project: Analog Conversion Project

Los Alamos photographic plate scattering chamber, cyclotron snout. Photo taken 10/12/1950. 60"-316. Principal Investigator/Project: Crocker Lab/60-inch

Donald Cooksey, Robert Sproul, and Ernest Orlando Lawrence. Photo taken 3/19/1943

Linear accelerator transfer line resistor setting control. Photograph taken April 24, 1947. LINAC-423

Topics

val fitch val fitch target bevatron nuclear research nuclear research facilities berkeley laboratory berkeley lab high resolution digital preservation file name special events atomic energy laboratory science us national archives industrial history