Workers weld brackets on the anti-climb plates during construction of the border barrier panels at the Barry M. Goldwater Range along the U.S.-Mexico border, near Yuma, Arizona, Feb. 25, 2020. USACE is providin More
Crews place concrete into a trench that will secure a 30-foot bollard barrier panel at Heading Two at the El Centro 1 border barrier location, El Centro, California, Feb. 28, 2020. These projects are being exe More
Workers trench an area where barrier panels will be set at Heading Three at the El Centro 1 border barrier location, El Centro, California, Feb.28, 2020. These projects are being executed by USACE, as directed More
Crews install a 30-foot barrier panel on the side of a hill at Heading Three at the El Centro 1 border barrier location, El Centro, California, Feb. 28, 2020. These projects are being executed by USACE, as dir More
Workers place concrete to build a low water crossing at the El Centro 1 border barrier location, El Centro, California, Feb. 28, 2020. These projects are being executed by USACE, as directed through the U.S. A More
Crews install a three-ton, 30-foot bollard barrier panel at Heading Two at the El Centro 1 border barrier location, El Centro, California, Feb. 28, 2020. These projects are being executed by USACE, as directed More