A cone marks the strip of runway scheduled for rubber
Summary
A cone marks the strip of runway scheduled for rubber removal April 4, 2015, at Bagram Air Field, Afghanistan. Airmen assigned to the 577th Expeditionary Prime Base Engineer Emergency Force Squadron forward deployed from Southwest Asia to remove the rubber build up on BAF’s flightline and ensure flying operations are carried out safely. At BAF, the Airmen remove rubber from 30,000 – 40,000 square feet of runway each day, and will cover a total of 382,000 square feet before redeploying. (U.S. Air Force photo by Staff Sgt. Whitney Amstutz/released)
Tags
Date
03/04/2015
Location
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright