Contractors work on the Alderwood Dam Project on April
Summary
Contractors work on the Alderwood Dam Project on April 27, 2015, on the Fort McCoy, Wis., North Post. The project included the removal of the old Alderwood Dam; obliteration of an existing asphalt road; removal of muck lake-bottom soil from what formerly was Alderwood Lake; and the installation of a new, precast bridge. The project was designed by Short Elliott Hendrickson Inc. of La Crosse, Wis. Michels Corporation, headquartered in Brownsville, Wis., is the contractor for the project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Tags
Date
27/04/2015
Location
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright