S125E011523 - STS-125 - Engineering Analysis Image - Contingency Cross-Tie QD Failure
Summary
The original finding aid described this as:
Description: Documentation of the Contingency Water Cross Tie Potable Quick Disconnect (QD) failure reported on Flight Day 8 of the STS-125 mission. The Supply Water Dumpline Purge Device could not be removed from the Contingency Water Cross Tie Potable QD that is located on the outboard wall of the Waste Collection System (WCS). Image taken for engineering analysis.
Subject Terms: STS-125, Water, Damage Assessment
Date Taken: 5/19/2009
Categories: Flight Station
Interior_Exterior: Interior
Ground_Orbit: On-orbit
Original: Digital Still
Preservation File Format: TIFF
STS-125
Tags
Date
2009
Source
The U.S. National Archives
Copyright info
No known copyright restrictions