Not developed or endorsed by NARA or DVIDS. Part of the World's largest public domain source PICRYL.com.

south pacific border district

public
965 media by topicpage 1 of 10
U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractor places barrier panels on a panel stand along the U.S.-Mexico border near Yuma, Arizona, March 23. USACE is providing direction and oversigh... More

Steel bollard barrier panels are installed in conjunction

Steel bollard barrier panels are installed in conjunction

Steel bollard barrier panels are installed in conjunction with a retaining wall for sections of the border barrier system at the Yuma 1 project site near Yuma, Arizona, Jan. 9, 2020. The Yuma 1 project spans ap... More

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and Commanding General, U.S. Army Corps of Engineers (left), discusses soil conditioning operations with a U.S. Army Corps of Engineers South Pacific Border Distr... More

The terrain and elevation varies throughout the

The terrain and elevation varies throughout the

The terrain and elevation varies throughout the approximately 15 miles of the U.S. Army Corps of Engineers El Centro 1 border barrier project near El Centro, California, April 30. These projects are being execu... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractor employees install the final panel at the Yuma 1 border barrier project near Yuma, Arizona, June 5. These projects are being executed by USAC... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew constructs a bridge along the U.S.-Mexico border near Naco, Arizona, Oct. 30. These projects are being executed by USACE, as directed... More

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development Center of Vicksburg, Miss., inspect a border barrier fabrication yard where bollard panels for several project are assembled near Yuma, Ariz., February 5, 20... More

Several miles of 30-foot-tall bollards disappear into

Several miles of 30-foot-tall bollards disappear into

Several miles of 30-foot-tall bollards disappear into the foothills of the Jacumba Mountain range at the El Centro 1 project site, near Calexico, California, January 23, 2020. Conditioned soil is then placed be... More

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor erects barrier panels on the El Paso project site near Santa Teresa, N. M., Sept. 10, 2019. The barrier system project spans approximately 46 miles, ... More

Border barrier completed by U.S. Army Corps of Engineers

Border barrier completed by U.S. Army Corps of Engineers

Border barrier completed by U.S. Army Corps of Engineers South Pacific Border District contractors stretches for miles along the U.S. southern border near El Centro, California, June 4. These projects are bein... More

San Diego 4 Border Barrier Project

San Diego 4 Border Barrier Project

U.S. Army Corps of Engineers South Pacific Border District contractors install panels along difficult terrain at the San Diego 4 border barrier project near San Diego, California, Sept. 4. These projects are be... More

U.S. Army Corps of Engineers South Pacific Division

U.S. Army Corps of Engineers South Pacific Division

U.S. Army Corps of Engineers South Pacific Division Commander Brig. Gen. Paul Owen travels to project sites to view border barrier construction at the U.S.-Mexico border near Yuma, Arizona, Sept. 24. USACE is p... More

U.S. Army Corps of Engineers Task Force Barrier contractors

U.S. Army Corps of Engineers Task Force Barrier contractors

U.S. Army Corps of Engineers Task Force Barrier contractors relocate a cactus away from the southwest border where barrier construction will be underway, near the border town of Lukeville, Ariz., Sept. 19, 2019... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors install several bollard-style barrier panels simultaneously at the Yuma 3 border barrier project near Yuma, Arizona, Aug. 13. These project... More

Acting Deputy Director of U.S. Bureau of Land Management

Acting Deputy Director of U.S. Bureau of Land Management

Acting Deputy Director of U.S. Bureau of Land Management William Perry Pendley tours U.S. Army Corps of Engineers Task Force Barrier project site San Diego 4 and discusses the southern border barrier system wit... More

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development Center of Vicksburg, Miss., inspect 30-foot border barriers at the El Centro 1 Project near Calexico, Calif., February 4, 2020. The U.S. Army Corps of Engine... More

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development Center of Vicksburg, Miss., inspect 30-foot border barrier panels at the El Centro 1 Project near Calexico, Calif., February 4, 2020. The U.S. Army Corps of ... More

A loader moves a panel, as construction crews place

A loader moves a panel, as construction crews place

A loader moves a panel, as construction crews place steel bollards at the El Centro site along the U.S.-Mexico border, near Calexico, California, January 23, 2020. The U.S. Army Corps of Engineers, South Pacifi... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew prepares a 59 degree grade over difficult terrain in order to place bollard style barrier panels along the U.S.-Mexico border near Co... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors construct a border road in the Tinajas Atlas Mountains in Arizona as part of the border barrier project on Aug. 5. USACE is providing direc... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors work together to place a barrier panel at the San Diego 4 border barrier project near San Diego, California, May 13. USACE is providing dir... More

Existing outdated Normandy barriers mark the approximate

Existing outdated Normandy barriers mark the approximate

Existing outdated Normandy barriers mark the approximate location of future 30-foot-tall bollards at the El Centro 1 project site near Calexico, California, January 23, 2020. The U.S. Army Corps of Engineers, ... More

Sen. Martha McSally thanks U.S. Army Corps of Engineers,

Sen. Martha McSally thanks U.S. Army Corps of Engineers,

Sen. Martha McSally thanks U.S. Army Corps of Engineers, South Pacific Border District Commander Col. Rafael “Pete” Pazos in Yuma, Arizona at an event commemorating the completion of 100 miles of border barrier... More

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and Commanding General, U.S. Army Corps of Engineers (right), discusses construction progress with U.S. Army Corps of Engineers South Pacific Border District proj... More

A western view at the U.S./Mexico border in San Diego,

A western view at the U.S./Mexico border in San Diego,

A western view at the U.S./Mexico border in San Diego, Calif. at U.S. Army Corps of Engineers Task Force Barrier project site San Diego 4, Oct. 15, 2019. USACE is providing direction and oversight for Departmen... More

Looking south, aerial photo of the border barrier.

Looking south, aerial photo of the border barrier.

Looking south, aerial photo of the border barrier. The Tucson 2 project spans five miles, near Douglas AZ, January 31, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contract... More

Col. Rafael “Pete” Pazos, newly appointed commander

Col. Rafael “Pete” Pazos, newly appointed commander

Col. Rafael “Pete” Pazos, newly appointed commander of the South Pacific Border District, passes the colors to Greg Hegge, deputy project manager, in an activation ceremony for the newly established District in... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor hammers in the footing of a panel brace at the Yuma 1 project site near Yuma, Arizona, Dec. 19, 2019. The Yuma 1 project spans approximate... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew prepares the project area for border barrier placement along the U.S.-Mexico border near Del Rio, Texas, Nov. 4. These projects are b... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew relocates existing barrier panels to prepare for border barrier placement along the U.S.-Mexico border near Del Rio, Texas, Nov. 4. T... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew installs bollard style barrier panels along the U.S.-Mexico border near El Centro, California, Nov. 11. These projects are being exec... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew constructs a retaining wall along the U.S.-Mexico border near Campo, California, Nov. 12. These projects are being executed by USACE,... More

A U.S. Army Corps of Engineers contractor uses a forklift

A U.S. Army Corps of Engineers contractor uses a forklift

A U.S. Army Corps of Engineers contractor uses a forklift to transport a steel bollard border barrier panel for installation near El Centro, Calif., Sept. 12, 2019. These projects are being executed by USACE, a... More

The U.S. Army Corps of Engineers South Pacific Border

The U.S. Army Corps of Engineers South Pacific Border

The U.S. Army Corps of Engineers South Pacific Border District identifies the original U.S.-Mexico border marker 77 for preservation near Douglas, Arizona, Dec. 12, 2019. The 276 monuments marking the U.S.-Mexi... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors prepare a trench for barrier panels at the San Diego 4 border barrier construction project near San Diego, California, May 13. USACE is pro... More

Crews add a 30-foot bollard panel at the Yuma 10/27

Crews add a 30-foot bollard panel at the Yuma 10/27

Crews add a 30-foot bollard panel at the Yuma 10/27 project at Barry M. Goldwater Range, Arizona along the U.S.-Mexico border, January 27, 2020. Yuma 10/27 will add a total of 31 miles of secondary border barri... More

Construction crews place steel bollards at the Tucson

Construction crews place steel bollards at the Tucson

Construction crews place steel bollards at the Tucson 3 project along the border barrier near Douglas, Arizona, January 15, 2020. The Tucson 3 project spans approximately 20 miles, replacing dilapidated and out... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District employee views construction of the flood wall and border barrier at the Yuma 1 project in Yuma, Arizona, May 6. These projects are being executed by ... More

A specialized off-road fork lift maneuvers over difficult

A specialized off-road fork lift maneuvers over difficult

A specialized off-road fork lift maneuvers over difficult terrain at the U.S. Army Corps of Engineers South Pacific Border District's Tucson 2 border barrier project near Lukeville, Arizona Aug. 5. These proje... More

San Diego 4 Border Barrier Project

San Diego 4 Border Barrier Project

U.S. Army Corps of Engineers South Pacific Border District contractors install panels along difficult terrain at the San Diego 4 border barrier project near San Diego, California, Sept. 4. These projects are be... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew installs lights along the U.S.-Mexico border near El Centro, California, Nov. 11. These projects are being executed by USACE, as dire... More

Looking south west, aerial photo of the border barrier.

Looking south west, aerial photo of the border barrier.

Looking south west, aerial photo of the border barrier. The Tucson 2 project spans five miles, near Douglas AZ, January 31, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing con... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor uses an excavator to dig a trench for the San Diego 15 border barrier project site near Campo, California, July 21. These projects are bei... More

Looking east at Monument Mountain. The Tucson 2 project

Looking east at Monument Mountain. The Tucson 2 project

Looking east at Monument Mountain. The Tucson 2 project spans five miles, near Douglas AZ, February 11, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting services, i... More

Crews level and secure a three-ton, 30-foot panel at

Crews level and secure a three-ton, 30-foot panel at

Crews level and secure a three-ton, 30-foot panel at the Barry M. Goldwater Range along the U.S.-Mexico border, February 10, 2020. Yuma 2 and Yuma 10/27 will add a total of 33 miles of secondary and replacement... More

Newly constructed border barrier panels set in concrete

Newly constructed border barrier panels set in concrete

Newly constructed border barrier panels set in concrete near El, Centro, Calif., Sept. 12, 2019. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in res... More

U.S. Army Corps of Engineers Task Force Barrier project

U.S. Army Corps of Engineers Task Force Barrier project

U.S. Army Corps of Engineers Task Force Barrier project engineer and chief of staff oversee rebar installation on the El Paso project near Santa Teresa, N.M. The barrier system project spans approximately 46 mi... More

Sand dunes are visible though the steel bollards of

Sand dunes are visible though the steel bollards of

Sand dunes are visible though the steel bollards of the border barrier system at the Yuma 1 project site near Yuma, Arizona, Jan. 9, 2020. The Yuma 1 project spans approximately 5 miles, replacing dilapidated a... More

Crews prepare to add a 30-foot bollard panel to first

Crews prepare to add a 30-foot bollard panel to first

Crews prepare to add a 30-foot bollard panel to first panel installed at the Yuma 10/27 project at Barry M. Goldwater Range, Arizona along the U.S.-Mexico border, January 27, 2020. Yuma 10/27 will add a total o... More

Acting Secretary of Homeland Security Chad F. Wolf

Acting Secretary of Homeland Security Chad F. Wolf

Acting Secretary of Homeland Security Chad F. Wolf answers questions from the media in Yuma, Arizona at an event commemorating the completion of 100 miles of border barrier system along the southwest border on ... More

Workers construct border barrier panels

Workers construct border barrier panels

Workers construct border barrier panels that will be used at the border barrier near the Barry M. Goldwater Range along the U.S.-Mexico border, near Yuma, Arizona, Feb. 27, 2020. USACE is providing direction an... More

A U.S. Border Patrol agent stands watch as U.S. Army

A U.S. Border Patrol agent stands watch as U.S. Army

A U.S. Border Patrol agent stands watch as U.S. Army Corps of Engineers South Pacific Border District contractor crews continue border barrier installation near Lukeville, Arizona, April 3. These projects are b... More

The American Canal parallels miles of the U.S. Army

The American Canal parallels miles of the U.S. Army

The American Canal parallels miles of the U.S. Army Corps of Engineers El Centro 1 border barrier project near El Centro, California, April 30. These projects are being executed by USACE, as directed through th... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors place concrete for the Yuma 2 border barrier project near Yuma, Arizona, May 21. USACE is providing direction and oversight for Department ... More

Maj. Gen. Scott Spellmon, selected as the 55th Chief

Maj. Gen. Scott Spellmon, selected as the 55th Chief

Maj. Gen. Scott Spellmon, selected as the 55th Chief of Engineers, U.S. Army Corps of Engineers, discuss the border barrier project with Col. Antoinette Gant, South Pacific Borders District commander, at South ... More

200819-A-OV291-1101: Maj. Gen. Jeffrey Milhorn, U.S.

200819-A-OV291-1101: Maj. Gen. Jeffrey Milhorn, U.S.

200819-A-OV291-1101: Maj. Gen. Jeffrey Milhorn, U.S. Army Corps of Engineers deputy commanding general for military and international operations, and Dr. Christine Altendorf, USACE chief of engineering and cons... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors work together to place a barrier panel at the San Diego 4 border barrier project near San Diego, California, May 13. USACE is providing dir... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors install barrier panels at the Tucson 3 border barrier project near Naco, Ariz., June 11. These projects are being executed by USACE, as dir... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors install panels at the Yuma 2 border barrier project near Yuma, Arizona, May 21. USACE is providing direction and oversight for Department o... More

U.S. Army Corps of Engineers contractors prepare to

U.S. Army Corps of Engineers contractors prepare to

U.S. Army Corps of Engineers contractors prepare to place next panel in ground at project site Tucson 3, Douglas, Ariz., Oct. 28, 2019. These projects are being executed by USACE, as directed through the U.S. A... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew installs headers along the U.S.-Mexico border near Naco, Arizona, Oct. 9. These projects are being executed by USACE, as directed thr... More

A crane hoists a second 30-foot bollard panel to add

A crane hoists a second 30-foot bollard panel to add

A crane hoists a second 30-foot bollard panel to add to first panel installed at the Yuma 10/27 project at Barry M. Goldwater Range, Arizona along the U.S.-Mexico border, January 27, 2020. Yuma 10/27 will add a... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors work together to place a barrier panel at the San Diego 4 border barrier project near San Diego, California, May 13. USACE is providing dir... More

Surveyors discuss the alignment of the San Diego 4

Surveyors discuss the alignment of the San Diego 4

Surveyors discuss the alignment of the San Diego 4 project on a rocky hilltop east of Otay Mountain, January 30, 2020. When finished, the 3.5-mile, 2808-funded San Diego 4 project will connect with nearly 20 mi... More

Construction crews place steel bollards at the El Centro

Construction crews place steel bollards at the El Centro

Construction crews place steel bollards at the El Centro 1 project along the U.S.-Mexico border near Calexico, California, January 23, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is pr... More

Crews install a three-ton, 30-foot bollard barrier panel at the Yuma 1 project site

Crews install a three-ton, 30-foot bollard barrier panel at the Yuma 1...

Crews install a three-ton, 30-foot bollard barrier panel at the Yuma 1 project site along the U.S.-Mexico border, Yuma, Arizona, Feb. 25, 2020. These projects are being executed by USACE, as directed through th... More

Looking west at ongoing construction efforts at Tucson 3

Looking west at ongoing construction efforts at Tucson 3

Looking west at ongoing construction efforts on March 6, 2020. The Tucson 3 project is twenty miles. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting services, including... More

USACE, South Pacific Border District contractors prepare a trench

USACE, South Pacific Border District contractors prepare a trench

U.S. Army Corps of Engineers South Pacific Border District contractor crews prepare a trench that will secure 30-foot barrier panels at the Barry M. Goldwater Range along the U.S.-Mexico border near Yuma, Arizo... More

Brig. Gen. Kimberly Colloton, Commander South Pacific

Brig. Gen. Kimberly Colloton, Commander South Pacific

Brig. Gen. Kimberly Colloton, Commander South Pacific Division, U.S. Army Corps of Engineers, talks with a USACE project manager about work at the Task Force Barrier El Paso 1 project site during a tour of th... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors prepare soil for barrier placement at the Tucson 3 border barrier project near Douglas, Ariz., June 11. These projects are being executed b... More

Border barrier stretches across the U.S. Army Corps

Border barrier stretches across the U.S. Army Corps

Border barrier stretches across the U.S. Army Corps of Engineers South Pacific Border District's San Diego 4 border barrier project near Otay Mesa, California, July 20. USACE is providing direction and oversigh... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew constructs a low water gate along the U.S.-Mexico border near El Centro, California, Nov. 11. These projects are being executed by US... More

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development

Engineers from the Engineer Research and Development Center of Vicksburg, Miss., inspect border barrier flood mitigation gates at the El Centro 1 Project near Calexico, Calif., February 4, 2020. The U.S. Army C... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew prepares the project area for border barrier placement along the U.S.-Mexico border near Del Rio, Texas, Nov. 4. These projects are b... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew installs bollard style barrier panels along the U.S.-Mexico border near El Centro, California, Nov. 11. These projects are being exec... More

Looking south at high flow barrier section. The Tucson

Looking south at high flow barrier section. The Tucson

Looking south at high flow barrier section. The Tucson 2 project spans five miles, near Douglas AZ, February 11, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting se... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor hammers in a stake at the San Diego 4 border barrier project near San Diego, California, May 13. USACE is providing direction and oversigh... More

The El Centro project first panel was installed Aug.

The El Centro project first panel was installed Aug.

The El Centro project first panel was installed Aug. 22, near Calexico, Calif. The border barrier project spans approximately 15 miles, replacing existing barrier with steel bollard barriers. USACE is providing... More

Concrete being laid at the El Paso 1 project, spanning

Concrete being laid at the El Paso 1 project, spanning

Concrete being laid at the El Paso 1 project, spanning 46 miles, near Deming, NM, January 28, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting services, including d... More

A U.S. Army Corps of Engineers Task Force Barrier workers

A U.S. Army Corps of Engineers Task Force Barrier workers

A U.S. Army Corps of Engineers Task Force Barrier workers pour concrete in preparation to install steel bollard barrier panels for placement near Columbus, N.M., Oct. 23, 2019. USACE is providing direction and ... More

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and

Lt. Gen. Todd Semonite, 54th Chief of Engineers and Commanding General, U.S. Army Corps of Engineers (center left), and Col. Rafael “Pete” Pazos, U.S. Army Corps of Engineers South Pacific Border District comma... More

Aerial photo looking west at Monument Mountain, near

Aerial photo looking west at Monument Mountain, near

Aerial photo looking west at Monument Mountain, near Douglas AZ. The Tucson 2 project spans five miles, January 31, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting... More

Crews create a trench for 30-foot, 2808-funded panels

Crews create a trench for 30-foot, 2808-funded panels

Crews create a trench for 30-foot, 2808-funded panels at the Barry M. Goldwater Range along the U.S.-Mexico border, February 10, 2020. Yuma 2 and Yuma 10/27 will add a total of 33 miles of secondary and replace... More

Construction crews place steel bollards at the Tucson

Construction crews place steel bollards at the Tucson

Construction crews place steel bollards at the Tucson 3 project along the border barrier near Douglas, Arizona, January 15, 2020. The Tucson 3 project spans approximately 20 miles, replacing dilapidated and out... More

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor worker checks alignment and prepares the bottom of the steel bollard barrier panels for concrete placement near Columbus, N.M., Oct. 23, 2019. USACE ... More

In a dry creek, excavators and dump trucks remove silt

In a dry creek, excavators and dump trucks remove silt

In a dry creek, excavators and dump trucks remove silt to be conditioned for additional sheet piling at the El Centro 1 project site, near Calexico, California, January 23, 2020. The U.S. Army Corps of Engineer... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District project manager discusses panel placement with Col. Rafael “Pete” Pazos, Border District commander (left) at the Tucson 3 project site during a site ... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractor crews conduct trench work in preparation for border barrier installation near Lukeville, Arizona, March 25. These projects are being execute... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District employees provide quality assurance on 20 miles of border barrier at the El Paso 5 project site near Fabens, Texas, June 16. These projects are being e... More

Acting Deputy Director of U.S. Bureau of Land Management

Acting Deputy Director of U.S. Bureau of Land Management

Acting Deputy Director of U.S. Bureau of Land Management William Perry Pendley tours U.S. Army Corps of Engineers Task Force Barrier project site San Diego 4 and discusses the southern border barrier system wit... More

Crews prepare a trench for 30-foot, 2808-funded panels,

Crews prepare a trench for 30-foot, 2808-funded panels,

Crews prepare a trench for 30-foot, 2808-funded panels, in the Barry M. Goldwater Range along the U.S.-Mexico border, February 10, 2020. Yuma 2 and Yuma 10/27 will add a total of 33 miles of secondary and repla... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractor employees work on the barrier in the U.S. Customs and Border Protection's Tucson Sector near Lukeville, Ariz. on June 18. These projects are... More

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor

A U.S. Army Corps of Engineers Task Force Barrier contractor digs a trench for bollard barrier panel placement near Yuma, Arizona, Nov. 13, 2019. These projects are being executed by USACE, as directed through ... More

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District

U.S. Army Corps of Engineers South Pacific Border District contractors install the final panel at the Yuma 10/27 Border Barrier project near Yuma, Arizona, Dec. 21. These projects are being executed by USACE, a... More

Steel bollard barrier system adjoins vehicle barriers

Steel bollard barrier system adjoins vehicle barriers

Steel bollard barrier system adjoins vehicle barriers awaiting replacement at the Yuma 1 project site near Yuma, Arizona, Jan. 9, 2020. The Yuma 1 project spans approximately 5 miles, replacing dilapidated and ... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor transports border barrier panels at the Yuma 3 project near Yuma, Arizona, May 5. These projects are being executed by USACE, as directed ... More

Brig. Gen. Kimberly Colloton, Commander South Pacific

Brig. Gen. Kimberly Colloton, Commander South Pacific

Brig. Gen. Kimberly Colloton, Commander South Pacific Division, U.S. Army Corps of Engineers, discussess progress being made on the Task Force Barrier Tucson 1 & 2 projects with a USACE contractor while touring... More

The terrain varies along the mountainous areas throughout

The terrain varies along the mountainous areas throughout

The terrain varies along the mountainous areas throughout the approximately 15 miles of the U.S. Army Corps of Engineers El Centro 1 border barrier project near El Centro, California, April 30. These projects a... More

Existing outdated Normandy barriers mark the approximate

Existing outdated Normandy barriers mark the approximate

Existing outdated Normandy barriers mark the approximate location of future 30-foot-tall bollards at the El Centro 1 project site near Calexico, California, January 23, 2020. The U.S. Army Corps of Engineers, ... More

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border

A U.S. Army Corps of Engineers South Pacific Border District contractor crew grouts bollard style barrier panels along the U.S.-Mexico border near El Centro, California, Nov. 11. These projects are being execut... More

Previous

of 10

Next

The objects in this collection are from The U.S. National Archives and Defense Visual Information Distribution Service. The U.S. National Archives and Records Administration (NARA) was established in 1934 by President Franklin Roosevelt. NARA keeps those Federal records that are judged to have continuing value—about 2 to 5 percent of those generated in any given year. There are approximately 10 billion pages of textual records; 12 million maps, charts, and architectural and engineering drawings; 25 million still photographs and graphics; 24 million aerial photographs; 300,000 reels of motion picture film; 400,000 video and sound recordings; and 133 terabytes of electronic data. The Defense Visual Information Distribution Service provides a connection between world media and the American military personnel serving at home and abroad. All of these materials are preserved because they are important to the workings of Government, have long-term research worth, or provide information of value to citizens.

Disclaimer: A work of the U.S. National Archives and DVIDS is "a work prepared by an officer or employee" of the federal government "as part of that person's official duties." In general, under section 105 of the Copyright Act, such works are not entitled to domestic copyright protection under U.S. law and are therefore in the public domain. This website is developed as a part of the world's largest public domain archive, PICRYL.com, and not developed or endorsed by the U.S. National Archives or DVIDS.  https://www.picryl.com

Developed by GetArchive, 2015-2024