The stilling basin at J. Edward Roush Lake, Huntington,
The stilling basin at J. Edward Roush Lake, Huntington, Ind., is refilled after it was dewatered and inspected.
JOHN MARTIN RESERVOIR, Colo. – View of the stilling
JOHN MARTIN RESERVOIR, Colo. – View of the stilling basin as seen from the end sill. The baffle blocks are on the left, on the right are pump lines to remove water from the basin. Photo taken Jan. 10, 2019.
JOHN MARTIN RESERVOIR, Colo. – A worker with McMillen
JOHN MARTIN RESERVOIR, Colo. – A worker with McMillen LLC cleans sediment from the stilling basin floor, Feb. 12, 2019. A $4.8 million contract for dewatering and sediment removal in the stilling basin area was... More
JOHN MARTIN RESERVOIR, Colo. – Photo of the stilling
JOHN MARTIN RESERVOIR, Colo. – Photo of the stilling basin with water in it after the inspection and repairs were completed, April 9, 2019.
The U.S. Army Corps of Engineers Nashville District
The U.S. Army Corps of Engineers Nashville District announces that Martins Fork Dam and fishing pier area are closing Jan. 8, 2018 for approximately 30 days while crews work to remove accumulated debris from th... More
JOHN MARTIN RESERVOIR, Colo. -- The stilling basin
JOHN MARTIN RESERVOIR, Colo. -- The stilling basin as seen after it was dewatered, December 2018.
The U.S. Army Corps of Engineers Nashville District
The U.S. Army Corps of Engineers Nashville District announces that Martins Fork Dam and fishing pier area are closing Jan. 8, 2018 for approximately 30 days while crews work to remove accumulated debris from th... More
JOHN MARTIN RESERVOIR, Colo. -- Colorado Parks & Wildlife
JOHN MARTIN RESERVOIR, Colo. -- Colorado Parks & Wildlife generously offered to assist USACE with this project by lending their electrofishing boat (seen in photo), a hatchery truck, and the expertise of their ... More
JOHN MARTIN RESERVOIR, Colo. – The baffle blocks in
JOHN MARTIN RESERVOIR, Colo. – The baffle blocks in the reservoir’s stilling basin are seen in this photo taken March 25, 2019. In the background, the contractor uses an excavator to remove equipment from the s... More
JOHN MARTIN RESERVOIR, Colo. – Photo of the dewatered
JOHN MARTIN RESERVOIR, Colo. – Photo of the dewatered stilling basin, March 26, 2019.
J. Edward Roush Lake staff finishes some work in the
J. Edward Roush Lake staff finishes some work in the stilling basin showing the dam at a no-flow state before opening it back up.
JOHN MARTIN RESERVOIR, Colo. – The three pumps used
JOHN MARTIN RESERVOIR, Colo. – The three pumps used to remove the water from the stilling basin, March 25, 2019. Photo by Huff Horton.
JOHN MARTIN RESERVOIR, Colo. -- View of the dam's stilling
JOHN MARTIN RESERVOIR, Colo. -- View of the dam's stilling basin as seen on June 14, 2018, before it was dewatered.
Rangers and engineers from the Tulsa District, U.S.
Rangers and engineers from the Tulsa District, U.S. Army Corps of Engineers Kansas Area Office remove equipment from the stilling basin below Elk City Dam's conduit, Oct. 3. The conduit is 16 feet in diameter a... More